On Saturday morning I drop the LEDs to the studio, Ger and his team spend the morning assembling the lighting units. A 5 metre strip of LED is wound around a drainpipe, the pipe is splintered at the base to sit on top of the battery and the time clock is built into the top of the pipe.
While all this is going on I abscond to the Phantom Studios to do an interview for 'The Kiosk' with Nadine O'Regan. You can listen to it here
Later I return to Poolbeg to admire the amazing job all the boys have done on the light units, they look like robotic, walking timebombs, it's a shame that nobody is going to see them.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment